the Forward-Looking Infrastructure Project has settled on a contractor, and construction began
                 on March 4, 2019, and completed the water supply of 33,000 CMD to the Linhai Industrial Park
                 on December 9, 2021.

                  Demonstration of the Anping Sewage Treatment Plant is estimated to provide 37,500 CMD of
                 reclaimed water per day for the Southern Taiwan Science Park – Tainan Science Park. The Tainan
                 City Government completed the contract signing on July 30, 2020, and started the construction

                 work in February 2021. As of the end of 2021, the progress of the project was about 23.76%.
                  In consideration of the economic benefits of using recycled water, the Rende Water Reclamation

                 Center project has been able to match the neighboring Chi Mei Industrial Company's desire to use
                 recycled water, so the water exchange mechanism is used to supply Chi Mei Industrial Company with
                 recycled water on Oct.29,2021. As of the end of 2021, it was in the process of conceptual design.

            (5) Achievement in the construction of stormwater systems

                  In accordance with Phase 3 (2021-2022) of the Executive Yuan's Forward-Looking Infrastructure
               Construction Plan for the Improvement of County and City Managed Rivers and Regional Drain-
               age, a budget of NT$5.65 billion to handle the construction of stormwater sewer systems and

               to work on the improvement of stormwater sewer watercourses, system planning, and pipeline
               surveys in phases, to continuously improve the bottlenecks of flooding in urban planning areas,
               to add drainage facilities such as stormwater sewer systems, pumping stations, and to implement
               the total urban concept of water control, a number of flood detention ponds have been built to
               improve urban drainage efficiency and reduce flooding probability.


                  In addition, in response to the risk of urban flooding caused by extreme weather, MOI has set
               aside NT$2 billion under the Urban Comprehensive Flood Control Management Construction
               Project (2022-2026) to handle innovative urban flood control planning, urban intelligent water
               monitoring, related regulatory adjustments and non-engineering measures, and maintenance and

               management of pumping stations in the Tamsui River Basin, etc. It is expected that through the
               overall consideration of drainage facilities in the region and with technological monitoring and
               transmission facilities, MOI will use big data analysis to develop the best drainage facility joint

               prevention and operation mechanism or provide effective and feasible flooding improvement
               solutions to raise the overall urban flood protection standard.

                    As of the end of 2021, the total length of storm sewer construction in the whole country was
                 5,629.26 km, the implementation rate of storm sewers was raised to79.33%, and the amount of