Overseas: Under the military procurement contract for Blackhawk helicopter parts and compo-
                 nents signed with the U.S., with the assistance of the Army Command Headquarters, the NASC
                 can procure aviation materials directly from the U.S. government. Parts can therefore be replen-
                 ished more readily and at a lower cost.

            4.  Meeting the annual office refurbishment target

                  To provide the space and facilities for the stationing of Blackhawk helicopters, the Taichung Station
               was completed in 2014, and the Kaohsiung Station was constructed in 2020. There are also ongoing
               office refurbishment projects. The construction of the Taitung Station was impacted by unfavorable

               factors such as the COVID-19 pandemic, weather, construction works at the airport, and a shortage
               of labor during 2021. Nevertheless, the body of the hangar and duty building have now been com-
               pleted, and are now being fitted out. The plans for the Taipei-Songshan Station were finalized in April
               2021. The soil improvement planning and structural design of buildings were then carried out by the

               technical services contractor based on the geotechnical investigation report. The basic design was
               completed in September 2021, and the detailed design was submitted in November of the same year.
               Preparations for the building permit application are now underway. Current progress is approximately
               two months ahead of schedule, so the annual work targets have been met.


            5. Accomplished search and rescue missions
                  The five primary missions, airborne search and rescue, disaster relief, emergency medical ser-

               vices, transportation, and reconnaissance and patrol, as well as training and exercises were con-
               ducted in 2021 (see attached Table 10-1).

              Table 10-1  Aerial Mission Performance


                                                     Transported  Support Personnel
                                         Rescued                                           Water
                      Total                           Personnel   (Medical and Emer-  Supplies
                             Flight Time
                                         Personnel
              Year   Sorties   (Hour:Minute) (The Wounded)   (Victims and  gency  Transported   Carried
                                                                                           (Metric
                     (Sortie)                      Patient’s Family)   Response Personnel)  (Kg)
                                         (Persons)                                          Tons)
                                                      (Persons)       (Persons)
              2017    4 719   7260:35      267          370            929         13 235    564
              2018    4 641   6491:50      286          277            468         48 327    370
              2019    4 417   6180:05      171          219            386         7 440     460

              2020    4 316   6082:27      229          320            487         13 821    802
              2021    4 975   7098:45      319          283            577         23 507   2 110