Page 174 - 2022 OUTLINE OF THE MINISTRY OF THE INTERIOR REPUBLIC OF CHINA
P. 174
XI. Information Operations
1. Building a Green Energy Cloud Data Center
The Board of Science and Technology, Executive Yuan started promoting the " Digital Nation and In-
novative Economic Development Program (also known as "DIGI+ 2017-2025") and passed by the 3524th
meeting of the Executive Yuan.", Through the development of a solid keystone for digital innovation,
the program aims to establish a safe and reliable application green energy cloud environment and an ul-
tra-broadband cloud infrastructure. The main contents to be completed are as follows:
(1) Build a secure network structure: In line with the Executive Yuan's policy of centralizing computer
facilities, the affiliated agencies' networks are centralized to the NFA and exported to the Internet,
and there are more than 40 internet lines for installation and lease cancellation.
(2) Green energy optimization of equipment room facilities: In order to optimize the energy efficiency of
the equipment room, 2 cold/hot aisle closed systems (including power system engineering and cabinet
air conditioners) are built, one of them is used for disaster prevention and emergency communications
system, and the other one is used for administration and fire protection system, EMIC 2.0 disaster pre-
vention and rescue information system, message service platform, and affiliated agency systems.
(3) Centralization and integration of information systems: The disaster prevention and relief cloud plan has
leased Chunghwa Telecom Dongqi computer room since 2012 to build and operate the "Response
and Information Service Platform" and "Message Service Platform". In line with the Executive Yuan's
computer facility centralization policy, in December 2019, the equipment and application systems were
relocated from the Dongqi computer room to the computer room of the NFA so as to save the cost of
leasing the equipment room and cabinets. The administrative and operation systems of the affiliated
agencies of the NFA were relocated to the
NFA's computer room to save the cost of serv-
ers, software and hardware, and basic equip-
ment in the computer room, as well as save
management manpower and electricity.
(4) Establish "cold and hot aisle separation".
(5) Set up the cabinet air conditioner and unin-
terruptible power system.
(6) Adopt energy-saving air-conditioning systems to Hot and cold aisle closed system