Page 81 - 2018 OUTLINE OF THE MINISTRY OF THE INTERIOR REPUBLIC OF CHINA
P. 81

6

                                                                          National Conscription






            is the MOI, while the NCA is responsible for policy execution. The duration of R&D substitute services
            and industry training substitute services is three-years, which can be divided into three stages. The

            first-stage is fundamental training and specialized training with a length of twenty-eight days. The
            draftees in the first-stage shall be governed by the appropriate statutes. The second stage commences
            afterward upon designation to the hiring unit and lasts till the end of the substitute service period

            (approximately 11 months). The third stage starts from the end of the substitute service period and lasts
            till the end of the day of expiration of the service period (2 years). The R&D substitute services has the
            merit of accepting a variety of conscripts; draftees holding overseas diplomas, draftees with physical
            condition for substitute service and draftees holding required diplomas with the physical condition for
            regular service are all eligible for application. Please visit https://rdss.nca.gov.tw for more information

            about the R&D substitute services and the industry training substitute services.

























              ▲  The tenth anniversary of R&D substitute services


               The R&D substitute services and industry training substitute services systems were executed in
            2008 and 2016 respectively. The statistics for R&D substitute services and industry training substitute

            service in 2017 are shown below:

            1. Firms' Applications for Review and Allocation of Draftees R&D substitute
               services and industry training substitute services in 2016

               Under the R&D substitute services and industry training substitute services system, 892 firms applied
            for a total of 9,849 draftees of R&D substitute services and industry training substitute services. The

            Conscription Agency received and assessed the referenced data and 875 firms were approved. Among


                                                                                                      79
   76   77   78   79   80   81   82   83   84   85   86